Quick answer
Dry-fit every wall, roof panel and loading door before you glue anything, then build the shell first and add the glazed roof and doors last so you can still reach inside. Paint the workshop floor and interior before the roof goes on.
Why this kit rewards planning over speed
Atelier Dufour is a workshop and stores building, so it has more going on than a plain cottage: wide loading doors, a glazed roof over the workshop floor, and an industrial-quarter setting. Those features are exactly the parts that punish a rushed build. A door glued slightly out of square will not sit flush, and a roof fixed too early blocks access to the floor you still need to paint.
The kit is a 28mm scale model, which means small tolerances. Treat the dry fit as a real build stage, not a formality, and keep your glue bottle closed until every sub-assembly has been checked.
Where the build order actually matters
Most laser-cut workshop scenery fails at two points: the glazed roof and the loading doors. The glazed roof is a large opening that shows the interior, so any squeeze-out or misaligned brace will be visible from above. The loading doors are the focal point at table level, so they need to open and close cleanly or stay fixed in one deliberate position.
Build the shell and interior first, paint the workshop floor while you can still reach it, then fit the roof and doors. If you plan to base the building, decide that before the walls go up, because adding a base later can lift the door line off the ground.
Step-by-step build plan
- Lay out and identify every sheet: Spread the sheets out and match each part to the instructions before you push anything out. Keep small braces and door parts in a tray so they do not get lost among offcuts. If a part is missing or unclear, stop and check the sheet edges before gluing anything.
- Dry-fit the shell without glue: Assemble the walls, floor and internal partitions dry, then check for square by measuring both diagonals. The common mistake is forcing a tab that is slightly tight; ease it with a light sand instead of pressure. A shell that rocks on a flat surface will not sit flat on a base later.
- Dry-fit the loading doors and glazed roof: Test the wide loading doors in their openings and set the glazed roof panels in place before any glue. Decide now whether the doors will be fixed open, fixed closed or left workable. If a door binds, find the tight edge before gluing; trimming after assembly is much harder.
- Glue the shell and interior: Glue the walls, floor and partitions in stages, checking square after each stage. Keep glue away from the door openings and the roof seat so later parts still fit. Wipe squeeze-out immediately; dried glue on a visible interior wall is difficult to hide.
- Paint the workshop floor and interior: Paint the workshop floor and any interior detail before the roof goes on. The glazed roof will show this area from above, so treat it as a visible surface rather than a hidden one. Leave the roof seat unpainted or masked so the roof still bonds cleanly.
- Fit the glazed roof and loading doors last: Glue the roof panels and doors only after the interior is painted and the shell is square. Check the doors open and close before the glue sets, and support the roof while it dries. Do a final sight-line check through the glazed roof before the glue fully cures.
Product facts
-
Atelier Dufour (Workshop & Stores) (28mm) CMYK: Atelier Dufour is a workshop and stores building with wide loading doors and a glazed roof over the workshop floor. Those two features are the parts most likely to be damaged or misaligned if you glue the shell together before dry-fitting them.
Atelier Dufour (Workshop & Stores) (28mm) CMYK
Atelier Dufour (Workshop & Stores) (28mm) CMYK