Quick Answer

Place the Elevation Platform first to create a stable raised surface, then attach the Large Tower Balcony & Bridge Base to the edge so the bridge base aligns with the platform's top for a seamless multi-level connection.

Why Start with the Elevation Platform?

The Elevation Platform provides a solid, ready-to-use raised surface that supports the weight of the tower balcony and bridge base. Without it, the balcony pieces can wobble or shift during gameplay.

Its painted finish matches the Dwarvenite aesthetic, so the transition between platform and tower pieces looks natural. This saves you painting time and ensures visual consistency.

Understanding the Balcony & Bridge Base Pieces

The Large Tower Balcony & Bridge Base set includes six pieces: two stone balcony platforms, two railings, a crenellated balcony, and a 6-inch tower half that serves as the bridge base. The bridge base is designed to connect towers with a bridge span, but it also works as a stable anchor for the balcony.

One common mistake is trying to attach the balcony directly to a tower without the bridge base. The bridge base provides the necessary flat surface and structural support for the balcony to sit securely.

Step-by-Step Setup Guide

  1. Position the Elevation Platform: Place the Elevation Platform on your table where you want the raised level to be. Make sure the surface is clean and flat so the platform sits evenly. Check that the platform does not rock or tilt before adding any pieces on top.
  2. Attach the Bridge Base to the Platform Edge: Take the 6-inch tower half (bridge base) from the Large Tower Balcony & Bridge Base set and align it with one edge of the Elevation Platform. The flat side of the bridge base should rest flush against the platform's side, with the top of the bridge base level with the platform's top surface. If the bridge base sits higher or lower than the platform, adjust the platform's position or add a thin spacer underneath.
  3. Add the Balcony Platforms: Place the two stone balcony platforms on top of the bridge base and the Elevation Platform. The platforms should span the joint, creating a continuous walking surface. Use the crenellated balcony piece at the outer edge for a fortified look. Press down gently to ensure the platforms lock into place; loose pieces can tip over during gameplay.
  4. Install the Railings: Snap the stone balcony railings onto the edges of the balcony platforms. The railings add detail and prevent miniatures from falling off the edge. Make sure the railings face outward and do not block the bridge base connection point if you plan to add a bridge later.
  5. Test Stability Before Play: Gently press on the assembled balcony and platform to check for wobble. If any piece shifts, disassemble and re-align the bridge base and platform. A stable build ensures that miniatures and accessories stay in place during your game session.

Products Used in This Guide

  • Large Tower Balcony & Bridge Base (Painted): This set contains 6 pieces: 2 stone balcony platforms, 2 stone balcony railings, 1 crenellated balcony, and 1 6-inch tower half (bridge base). The bridge base piece is the key connector that lets you attach the balcony to the Elevation Platform without gaps or instability.

    Large Tower Balcony & Bridge Base (Painted)

    Large Tower Balcony & Bridge Base (Painted)

  • Elevation Platform (Painted): The Elevation Platform adds vertical dimension to tabletop scenes with a sturdy, ready-to-use raised surface that blends seamlessly with other Dwarvenite pieces. It gives you a reliable foundation for multi-level builds, so the tower balcony and bridge base stay level and secure during play.

    Elevation Platform (Painted)

    Elevation Platform (Painted)